Axon Execution / Venture BuildingAPG × AXON
63 assessed opportunities · complete cases require accessInternal catalogue · 63 tracks ↗
← Back

APG × AXON

How we engage

A joint development agreement (JDA) or customer-funded engineering (NRE) starts with a defined question, agreed deliverables and criteria for the next decision.

  1. 1

    Challenge and requirements

    Describe the application, system interfaces and decision to be made.

  2. 2

    Paid feasibility or validation study

    Agree the study price, measurements, responsibilities and acceptance criteria.

  3. 3

    Agree deliverables and rights to existing and new IP

    Assign delivery responsibility, data access and rights to existing and new IP.

  4. 4

    Model, design, prototype and test

    Carry out the agreed analysis and document the results.

  5. 5

    Decision based on technical results

    Review results against the acceptance criteria before committing further funds.

  6. 6

    Design-in, partner manufacture, licence or next tranche

    Choose the next phase once technology, rights, economics and partner responsibilities are clear.

Typical deliverables

  • Requirements and interface definition
  • Architecture and topology trade study
  • Modelling, simulation and design review
  • Prototype and test plan
  • DPT, EMC, thermal and stability investigation
  • Measured dataset and technical decision
  • Documentation, BOM and transfer package
  • IP and foreground terms per SOW

APG × AXON × PARTNERS

Development may lead to a licence or a new company.

APG contributes relevant technical depth from 13 years of research and project development. Axon Execution brings together customers, business model, team and capital. With an industrial or investment partner, a validated track can become a NewCo.

01 / JDA · NRE

Develop with the customer

Begin with a scoped, paid study. Set out interfaces, rights and acceptance criteria in a joint development agreement.

02 / DESIGN-IN · LICENCE

A building block in the partner’s product

Validated hardware, knowhow or IP can enter the OEM’s product through engineering, transfer or licensing once delivery and field rights are documented.

03 / NEWCO

A standalone company when the case supports it

Combine related tracks in one company when technology, customers and risks fit together. Equity, IP, responsibilities and funding are negotiated for the actual case, not assumed in advance.

  1. 1Customer problem
  2. 2Paid validation
  3. 3Clear rights
  4. 4Viable economics + team
  5. 5Funded NewCo decision

Detailed assumptions, financial scenarios and internal review material are preserved on the access-controlled internal site.

How we structure the partnership ↗

NEXT STEP

Which power-electronics challenge is holding up your programme?

Tell us about the system, the specific challenge and the decision you need to make. We can then scope a relevant technical and commercial study.

The links open your email client. Requests for materials are reviewed individually; access is not automatic.